skip to content
SDA SE Wiki
Software Engineering for Smart Data Analytics & Smart Data Analytics for Software Engineering
User Tools
Log In
Site Tools
Search
Tools
Old revisions
Recent Changes
Media Manager
Sitemap
Log In
>
Recent Changes
Media Manager
Sitemap
You are here:
SDA Software Engineering Research Group
»
Teaching in Software Engineering and Semantic Web
»
Software Engineering Labs
»
xp
»
Agile Software Development Lab, Fall 2008
»
S16: Indicator for Mr.X's next revelation
Sidebar
Agile Fall 2008
Previous Labs
09a
|
08a
|
07b
|
07a
|
06b
|
05b
|
05a
Installation
Ruby/Rails setup
Continous Integration
Technical
URLs
Clipboard
Lessons Learned
Acceptance Tests
Preparation seminars Agile Lab 2008b
Ruby on Rails
Process
XP / Scrum / Lean
Sandwich
Agile-Lab 2008b, Some external impressions
Agile Lab 2008b - 2nd visit
Guest Comments and Feelings
Evaluation
Archive
Schedule before Lab
Past Schedule
Finding the b-it
Pizza Order from 10.09.08
Confidential
S16: Indicator for Mr.X's next revelation
Acceptance Test
There should be at least two players with one mobile device each. One player will join the game as Mr X. The others will join as detectives.
They will be able to see their own icons and the revelation indicator showing the time left till next revelation on their respective screens.
On the screen of Mr X, he will be able to see the other players' icon (detective icon).
By the time the indicator hits “no time left” Mr.X's position will be reveled to all players.
The revelation indicator will reset and show the time until the next revelation of Mr.X.
Repeat the last three steps several times. Mr.X should change position between revelations.
teaching/labs/xp/2008b/s16_indicator_for_mr.x_s_next_revelation.txt
· Last modified: 2018/05/09 01:59 (external edit)
Page Tools
Old revisions
Rename Page
Back to top
SEWiki
, © 2025